Prepare the wet area
Floors, corners, drains, and pipe penetrations are inspected and made ready.

Under-tile wet-area waterproofing for floors, wall junctions, pipe entries, and concealed leakage points.
Bathroom waterproofing must form a continuous barrier below the finish before tiles and fixtures conceal the critical details.
Water can pass through tile joints and find weak corners, drains, pipe entries, or cracks beneath the finished surface.
Once concealed leakage begins, it can damage ceilings, adjoining rooms, electrical services, and decorative finishes.
A correctly detailed under-tile system prevents these problems before the bathroom is completed.

This system is selected when the structure, exposure, and day-to-day use call for a tailored waterproofing approach — not a one-product answer.
Every engagement starts with understanding the structure — then selecting and applying the right construction chemical system for lasting protection.
Floors, corners, drains, and pipe penetrations are inspected and made ready.
Junctions and penetrations are reinforced before the main membrane is applied.
The treated area is checked for water-tightness before protective finishes proceed.